@rgemas Planning Module: The Plan Updates with Shop-Floor Production
The argemas planning module places the orders you select on the production lines you select, day by day. It calculates each order's efficiency and daily capacity on each line, tries to assign the order to the line where it runs most efficiently, and updates the plan according to actual production on the floor.
How does planning start?
The main screen shows dates across the top and the plant's lines down the side. The model selection list shows each order's quantity, required ship date, the quantity planned and not yet planned so far, the lines it is planned on and its status in production. The models and lines to plan are chosen from these lists; the example in the video plans 9 models on 4 lines.
How is capacity calculated for an order never produced before?
The system shows at what efficiency and how many pieces per day each selected order would be produced on each selected line. The order does not need to have been produced on that line before: if it has never been produced, efficiency and capacity are derived automatically with similarity methods.
Not every selected line has to be used. To maximise efficiency, the program tries to assign each order to the line where it runs most efficiently.
How are holidays, overtime and model changeovers planned?
Saturdays, Sundays and weekday holidays are marked in advance in the line holiday and occupancy calendar; holidays and overtime can also be entered per line. No work is assigned to holidays, and working days are filled to full capacity. At a model changeover, if two models can be output on the same day, the plan places both on that day.
When the plan is created, a summary screen shows how many days were planned, the resulting efficiency and the quantity planned.
Can the plan be changed manually?
Yes. Prioritisation can be applied by colour or by order. In move mode, manual changes are made on the plan by drag and drop.
How is the plan synchronised with shop-floor production?
The live tracking screen shows production on the lines day by day. The "sync with live tracking" button compares actual production on the selected lines with the plan; where there is a deviation, it pulls orders earlier or pushes them later and brings the plan in line with the current state. The outcome of the plan is evaluated on the same screen so that action can be taken.
Full video transcript
The narration of the video, translated from the Turkish original.
Hello. I am going to give you a short introduction to our new module, the planning module.
The main page you see on the screen is the first grid of the planning module. It is empty because we have not made a plan yet; we will make one together in a moment. In this part you see the dates, and going down you will see the lines in your plant listed.
First we press model capacity. Then, by pressing select model, you reach a list of the models running in your factory. Here you can see each order's quantities, the date it has to ship, the quantity planned so far, the part not yet planned, the lines it is planned on, the work plan and its status in production. I have now selected 9 models. I select them by pressing the select button.
Then, under select line, you can again see all the lines in your plant. We select the lines we are going to plan on. You can see that 4 lines are now selected in this location. I choose use selected and then press the fetch button.
Here you can see, if the 9 orders I selected were produced on the 4 lines, at what efficiency and what capacity, and at how many pieces a day, they would be produced. At this point the orders do not need to have been produced on these lines before. Even if an order has never been produced, the system can derive the efficiency and capacities automatically with a number of similarity methods it uses in the background.
I want to add one last thing here. This does not mean the orders will be produced on all of these lines. It will choose one of the four lines; but of course our program tries to maximise efficiency by trying to choose the most efficient lines. I choose save and use. Then we press the create plan button.
Here you can see the line holiday and occupancy calendar. In this part you can mark in advance the holidays the factory may take, on Saturday, Sunday or on weekdays. You can enter them per line as well, and you can also enter overtime here. To keep things quick I am skipping these entries for now and choosing confirm holidays.
Then, along with a plan compression warning, it made our plan. As you can see, we find a summary of the planned jobs: how many days were planned, what efficiency resulted, how many pieces were planned and so on. I am closing this for now.
You will remember we had set up only four lines. It listed the lines on which we can produce the nine models most efficiently. As you can see, at model changeovers, if it can output two models within the same day, those appear as well. We had also marked Saturdays and Sundays as holidays; it makes no assignments there. It fills every day to full capacity and plans the lines by choosing those where the models or orders can be produced at maximum efficiency.
Here, if you wish, you can apply prioritisation by colour or by order, or make manual changes on your plan with move mode. Drag-and-drop moves are possible as you like.
We also have a live tracking module here. In live tracking you can follow the production already done on the lines; it shows production day by day. To reflect it in the plan we have the sync live tracking button. When you press sync with live tracking, for the lines you selected, if past production deviates from your plan in any way, it evaluates this and brings your plan in line with the current live state by pulling orders earlier or pushing them later. That way you can evaluate the results of your planning here and take action.
For more detailed information, please stay tuned.