Arge Bilişim
Blog | Arge Bilişim argemas

Blog

Writing on manufacturing, productivity and digital transformation

· 9 min read

How to calculate line balancing

Takt time, people per operation, operator loading and balance efficiency: the line balancing calculation for a sewing line, step by step with worked numbers.

· 7 min read

How to calculate an operator's bonus

Bonus limit, bonus minutes, quality and operation coefficients: how to work out a garment operator's bonus step by step. Worked example from a 2022 paper.

· 8 min read

How to calculate sewing line efficiency

The formula, standard minutes, lost time and the profit threshold: work out your sewing line's efficiency with your own numbers. Examples from a 2022 paper.

· 9 min read

What to ask in an MES software demo

An MES demo shows the vendor on their best day. Read advice written for sellers from the buyer's side and turn the demo into a test of your own factory.

· 9 min read

Where to start with a smart factory

A smart factory isn't built with one technology. Use acatech's six-stage Industrie 4.0 Maturity Index to see where your factory stands and find the first step.

· 12 min read

Four ways to be more ambitious with AI

Anthropic's Felix Rieseberg describes four ways to get more out of AI: speed, altitude, depth and range. With examples from the factory floor.

· 3 min read

We already have SAP. Why would we need MES?

ERP knows what should happen; MES knows what happens on the shop floor. How to digitalise production while SAP, Logo or Netsis stays in place.

· 5 min read

The cost of delaying digitalisation

Putting off digitalisation looks free, but the way you work today has a price too. How to see that price and work it out with your own numbers.