
SAP-Integrated MES for Textile Manufacturers
SAP stays in place; sewing-line and subcontract data is collected on the floor and written back to SAP
In a textile factory that runs SAP, orders, stock and cost live in SAP; what happened today on the sewing line, in cutting and at the subcontract workshop is known on the shop floor. argemas MES is a Turkish production layer that integrates with SAP: it is installed on top of SAP, and SAP stays in place. Orders, bills of materials and stock in SAP are passed to argemas; actual production, operator time, waste and cost data collected on the floor are written back to SAP.
What data flows between SAP and argemas MES?
The SAP integration runs in both directions. SAP keeps managing the plan; argemas MES writes what actually happened on the floor back to SAP in real time.
From SAP to argemas MES: orders, bills of materials and stock.
From argemas MES to SAP: actual production, operator time, waste and cost data.
The same two-way integration applies to Logo, Netsis, Mikro and Oracle.
argemas has ready-made integrations with more than 30 global and Turkish systems.
What shop-floor data does a textile MES add to SAP?
argemas measures each operator's efficiency on each operation: pieces produced are multiplied by the operation's standard time and divided by the operator's working time. Pieces are counted through the bundle system or a barcode or RFID tag on every product. Lost time such as machine breakdowns or waiting for material is reported separately from efficiency, and results are monitored in real time by line, product, operator and operation.
Fabric, accessories and semi-finished goods sent to subcontractors are dispatched by lot on RFID- or barcode-tagged shipment lines, and the quantity and quality of returning goods are approved in the system. The fabric inspection module scores defects with the 4-point system, and defective fabric is separated before it reaches cutting.
Module by module, without touching your SAP project
argemas MES modules can be taken one at a time, so you digitalise only the production processes you need. Your SAP project and your SAP users stay as they are.
How long does an SAP-integrated MES take to implement?
It depends on the scope of the project and the size of the factory. In a typical mid-sized textile plant the first modules go live within 3 to 6 months; full integration and maturity are reached in 8 to 12 months. Complex multi-site installations can take up to 24 months.
Related solutions
Frequently Asked Questions
Questions textile manufacturers running SAP ask about SAP integration and MES.
